SCAPE Easy-Picker
Item number: EP10-03
Show gallery
With the SCAPE Easy-Picker you can take the next step in automation, where you get more flexibility and options with a Bin-Picking system.
Delivery: Kontakt for leveringstid
Show gallery
Item number: EP10-03
Show gallery
With the SCAPE Easy-Picker you can take the next step in automation, where you get more flexibility and options with a Bin-Picking system.
Delivery: Kontakt for leveringstid
SCAPE Easy-Picker – a complete, flexible, reliable and cost-effective solution for a wide range of pick & place needs or bin-picking tasks. It is ideal for automation in small businesses and businesses with no automation experience, and anywhere people perform manual repetitive work picking parts from pallets, machine boxes, fixtures or conveyor belts.
Scan – recognize – grab and the SCAPE Easy-Picker is ready for Pick & Place as well as bin-picking. The complete solution is easy to install and can be upgraded with standard modular hardware components.
What is included?
SCAPE Tool Unit with SCAPE Grid Scanner & two grippers (completely assembled)
Tool Unit Controller (completely assembled)
Energy chain for robot
PC with installed software
Box with items for testing the solution
Calibration plate
Cables
Weight (Tool Unit) | 4.2 kg | ||
Max size/dimension | Approx. 200 mm. | ||
Max weight | 0.6 kg | ||
Materials/units to grip | All types |
This calculator shows the potentially dramatic impact in savings on a robot versus manual labor over the life of the project.
Takes only 1 minute to complete
Our calculator should be seen as an indication. With each installation, there may be other costs / savings that affect the repayment of the individual installation.Total system costs for new automation solution
Number of robots for new solution
Application of solution
Annual labor costs per operator, including employee benefits
Number of operators released per shift
(Note: % part that is released is entered on the next page)Percentage of workforce retained for system operation per shift:
Expected increased productivity
Other savings
Year
Months
Break even
Freed labor over 7 years
Productivity improvement over 7 years