Beckhoff C6920-0050
Item number: C6920-0050

View gallery
Control cabinet for Industrial PC
In stock: Delivery 1 - 3 days
View gallery
Item number: C6920-0050
View gallery
Control cabinet for Industrial PC
In stock: Delivery 1 - 3 days
Industrial PC C6920 is designed for mounting a control cabinet.
The compact housing is equipped with a 3½-inch motherboard for Intel® Celeron® or Core ™ i3 / i5 / i7.
All PC connections are located on the front of the house.
Cooling is done using internal cooling surfaces and an easily replaceable fan cartridge at the bottom of the housing.
Processor Intel® Celeron® 2000E 2.2 GHz, 2 cores (TC3: 50)
3-inch motherboard for 4th gen Intel® Core ™
i3, Core ™ i5, Core ™ i7 or Celeron®
1 Mini PCI slot for cards installed ex factory
2 GB DDR3L RAM expandable to 16 GB
Graphics adapter integrated in the Intel® processor, 1 DVI connector
Built-in dual Ethernet adapter with 2 x 100 / 1000BASE-T connectors
Built-in SATA RAID 1 controller, Intel® Rapid Storage Technology hard drive, 2½ inch, 320 GB
1 serial port RS232, 2 USB 3.0 ports and 2 USB 2.0 ports
24 V DC power supply
Industrial PC for space-saving control cabinet installation | |||
Mounting plate at the rear wall | |||
All connectors at the same level | |||
Flexible mounting mechanism for free adjustment of the connection area | |||
Status Diodes | |||
Lithium battery easily accessible | |||
1 slot for a 2½-inch hard drive or SSD behind the front cover | |||
5 cm (2 ") free space on the top and bottom of the PC needed for air circulation | |||
Air circulation | |||
Protection class IP 20 | |||
Weight of the basic configuration 1.9 kg (4.2 lbs) | |||
Operating temperature 0 ... 55 ° C | |||
Compact dimensions (W x H x D) 65 x 235 x 121 mm without mounting plate |
This calculator shows the potential impact on savings with a robot compared to manual labor during a project's life
Only takes 1 minute to fill out
Our calculator should be seen as an indication. Other costs/savings affecting the repayment of the individual installation may occur.Total system costs for new automation solution
Number of robots for new solution
Use of solution
Annual labor costs per operator including employee benefits
Number of operators released per shift
(percentage relased to be entered on the next page)Percentage of labor maintained for system operation per shift:
Expected increased productivity
Other savings
Year
Months
Break even
Liberated labor in 7 years
Productivity improvements in 7 years